Spray-on polymers suit flat to moderate surfaces under sheet flow that need fast, temporary protection. Hydromulch suits moderate slopes where vegetation is the goal. Erosion control blankets suit steeper batters and light concentrated flow. Concrete or articulated mats suit channels, outlets and banks carrying fast, concentrated flow. Slope, flow type and how long the surface must last decide the choice.
Each method has suppliers who present it as the answer for every situation. This guide compares the four on the criteria that actually decide performance, drawing on the International Erosion Control Association (IECA) guidance most Australian projects are designed to, and shows where combining methods gives a better result than any one alone.
Four questions that decide the method
IECA’s general guidance puts the principle simply: erosion control measures need to be appropriate for the slope of the land and the expected wind and surface flow conditions. In practice that comes down to four questions:
- How steep is the surface? Slope is usually expressed as horizontal to vertical (for example 3H:1V). Steeper slopes increase runoff velocity and make loose or sprayed covers more likely to slip or wash off.
- Is the flow sheet or concentrated? Rain falling on a batter and running off evenly is sheet flow. Water gathered into a drain, gully, outlet or channel is concentrated flow, which carries far more energy and needs a much more robust surface.
- How long must it last? Weeks over a shutdown, months until the next construction stage, or permanently? Temporary covers are cheaper; permanent protection usually means vegetation or hard armouring.
- Is vegetation the end goal? If the surface will be revegetated, the method should help plants establish. If it will be disturbed again soon, there’s no point paying for seed.
Two site factors sit alongside these. Dispersive (sodic) soils erode internally and need treating, often with gypsum, regardless of surface cover. And upslope water should always be diverted away from the treated area first; no surface treatment copes well with runoff that should never have reached it.
The four methods
Spray-on polymer (soil binder). A diluted polymer, such as GRT: Enviro-Binder, is sprayed onto the soil surface, where it penetrates the top layer and cures into a water-resistant crust. It needs no establishment time, applies with a water cart or spray unit, and protects bare surfaces from raindrop impact, sheet erosion and wind. It is a surface treatment, so it’s designed for sheet flow rather than channelled water, and it doesn’t add organic cover for plants unless combined with seed or mulch.
Are environmental regulations, health and safety concerns or potential profit loss a concern right now?
Hydromulch. A slurry of water, seed, fertiliser, fibre mulch and a tackifier (often a polymer) sprayed over the surface. IECA guidance describes paper or wood pulp mulch with an acrylic polymer or other tackifier at 5 to 10% by weight, giving an expected useful life of roughly two to six months. It provides instant cover and supports seed germination, but birds can take seed, and IECA notes it can be problematic in the wet tropics, where products such as Bonded Fibre Matrix may be preferred.
Erosion control blankets and mats. Rolled products made from straw, coir, jute or synthetic fibres, pinned over the surface. They give a physical layer that resists both raindrop impact and moderate flow, and they hold seed and soil in place while vegetation establishes. IECA groups them into classes by duty, with lighter blankets for rural and urban batters and heavier mats for embankments, chutes and drainage channels. Installation detail matters: blankets must be overlapped in the direction of flow and keyed in at the top so water runs over them, not under.
Concrete and articulated mats. Interlocking concrete blocks or cast-in-place concrete mattresses laid over geotextile. They provide hard armour for areas carrying fast, concentrated flow: drain inverts, culvert outlets, spillways and creek banks. Some designs leave voids for grass to grow through. They are the most expensive option per square metre and are generally permanent, but they handle flow velocities that would strip any soft cover.
Comparison table
| Spray-on polymer | Hydromulch | Erosion control blankets | Concrete / articulated mats | |
|---|---|---|---|---|
| Typical slope range | Flat to moderate batters | Flat to moderate; steeper with heavier fibre mixes or BFM | Moderate to steep; heavier classes for steeper batters and channels | Steep banks, channels and outlets |
| Flow type | Sheet flow | Sheet flow | Sheet flow and light to moderate concentrated flow (by class) | Fast, concentrated flow |
| Typical life | Weeks to months, depending on traffic and rainfall | About 2–6 months | Months to years, depending on fibre | Permanent |
| Supports vegetation | Only when combined with seed or mulch | Yes; seed included | Yes; holds seed and soil | Only in open-cell designs |
| Time to protect | Hours, once cured | Immediate cover | Immediate on installation | Immediate on installation |
| Installation | Water cart or spray unit; fast over large areas | Hydromulch unit | Manual or machine laying and pinning; labour intensive on large areas | Plant and crew; geotextile and anchoring |
| Relative cost | Low | Low to moderate | Moderate | High |
| Best fit | Large bare areas, pads, stockpiles, trench lines and areas to be re-worked | Batters to be revegetated | Steeper batters, drain banks and areas needing long-term cover | Drains, outlets, spillways and eroding banks |
IECA’s default selection guide for erosion control mats illustrates how slope drives the choice of blanket class, with maximum bank slopes ranging from 4:1 for light rural products to 1:1 for the heaviest channel-lining class. Where manufacturer test data is available, selection should be based on that data rather than the default table.
Which method for which situation
Use this as a starting point, then confirm against the project’s erosion and sediment control plan and the relevant IECA guidance:
- Flat or gently sloping bare areas that will be disturbed again (pads, laydowns, cleared stages, trench lines): spray-on polymer. Fast, cheap over large areas, and easy to re-work.
- Stockpiles left for weeks or months: spray-on polymer over a shaped pile, or anchored covers for small piles.
- Moderate batters to be revegetated: hydromulch, or polymer combined with seed. Use a heavier fibre mix or Bonded Fibre Matrix in high-rainfall or tropical areas.
- Steeper batters, especially where vegetation will be slow: erosion control blankets of a class suited to the slope, keyed in at the top and overlapped down-slope.
- Drain banks and low-velocity channels: heavier erosion control mats rated for the expected flow.
- Culvert outlets, spillways, high-velocity drains and eroding creek banks: rock armouring or concrete and articulated mats designed for the flow velocity.
- Short-term protection over a shutdown or wet season: spray-on polymer over flat areas and moderate batters, blankets on steeper faces, and hard armour wherever concentrated flow is expected. The Christmas shutdown checklist applies this at site scale.
The common mistake is using a sheet-flow method where water concentrates. A polymer crust or hydromulch layer that performs well on the face of a batter will fail quickly in the drain at its toe. Treat the face and the flow path as two different problems.
Combining methods
Most sites get the best result by layering methods rather than choosing one:
- Polymer with seed. Adding a polymer binder to a seeding application holds seed and topsoil in place while vegetation establishes, giving immediate protection plus a long-term cover. Polymers are also commonly used as the tackifier within hydromulch mixes.
- Blankets with a binder over the top. On steeper batters, a binder sprayed over an installed blanket or mulch helps bind fines underneath and reduces wind loss before vegetation closes over.
- Soft face, hard flow path. Treat the face of a batter with polymer, hydromulch or blankets, and armour the drain, outlet or toe with rock or concrete mats. Each method then does the job it’s designed for.
- Temporary now, permanent later. Use a spray-on polymer to stabilise a surface during construction, then replace it with permanent revegetation or armouring once final levels are set. Because a polymer crust can be ripped and worked back into the soil, it doesn’t leave anything to remove before the permanent treatment goes on.
GRT: Enviro-Binder is formulated for the spray-on role in these combinations: broadacre surface protection, stockpiles, trench lines and batters under sheet flow, and as a binder with seed. For larger renewable energy sites, see how these methods fit into a full solar farm ESCP, and for linear projects, the transmission access track guide.
Frequently asked questions
Erosion control blankets or mats of a class rated for the slope are usually the first choice on steep batters, often combined with seed. Where the slope also carries concentrated flow, rock or concrete armouring may be needed.
Not universally. Hydromulch is cheaper and faster over large areas of moderate slope and gives instant cover with seed. Blankets hold up better on steeper slopes and in light concentrated flow, and last longer.
Typically weeks to months, depending on the product, application rate, rainfall and whether the surface is trafficked. It is designed as temporary protection for surfaces that will be re-worked or revegetated.
They’re designed for sheet flow on surfaces rather than concentrated flow in channels. Drains and outlets usually need blankets rated for channel flow, rock or concrete armouring.
Where fast, concentrated flow would strip softer covers: culvert outlets, spillways, high-velocity drains and eroding creek banks. They are generally a permanent solution.
Match the blanket class to the slope, expected flow and how long protection is needed. IECA’s selection guidance sets default slope limits by class, but manufacturer test data should be used where available.
Managing unsealed roads as well as batters? See our council dust suppression program template.
Sources
- IECA / Catchments & Creeks — Erosion Control: General (EC-1) — matching measures to slope, wind and flow conditions; method selection overview
- IECA / Catchments & Creeks — Light Mulching, including hydromulching (Accessible copy) — hydromulch composition and tackifier rates; 2–6 month useful life; wet tropics limitations
- IECA / Catchments & Creeks — Erosion Control Mats (Accessible copy) — default selection guide by class with maximum bank slopes from 4:1 to 1:1; use of manufacturer test data
- IECA / Catchments & Creeks — Erosion Control Blankets (ECB-1) (Accessible copy) — blanket classes and installation (overlap and keying)
- GRT — Solar farm ESCP template, Christmas shutdown erosion control checklist, Transmission access tracks
Author: Troy Adams, Managing Director, Global Road Technology · Last reviewed: 16 November 2026
Troy Adams
Troy Adams is the Managing Director of Global Road Technology (GRT) Specialising in Engineered Solutions for Dust Suppression, Erosion Control, Soil Stabilisation and Water Management. A pioneering, socially conscious Australian entrepreneur, Troy Adams is passionate about health and safety and providing innovative solutions that are cost-effective to the mining industry, governments and infrastructure sectors. Troy is also a tech investor, director of companies like Crossware, Boost, Hakkasan, Novikov and more.