GRT / SEDIMENT CONTROL SOLUTIONS
Stop sediment
at the source.
Protect exposed soil. Clarify captured water. Get a practical erosion and sediment-control approach for your site.
FREE CONSULTATION & QUOTE
Tell us where
sediment starts.
Leave your details. A GRT specialist can help plan your next step.
Just three required fields: name, email and phone.
How we handle your enquiry: Privacy Policy.
THE RIGHT TOOL FOR EACH STEP
An integrated range.
One product will not fit every slope, soil or basin. GRT can recommend an application and treatment combination after learning about your site.
01 / PREVENT
GRT: Enviro-Binder
A spray-on polymer that binds exposed soil and helps reduce wind and water erosion while allowing vegetation to establish.
Get Free Sample & Free Quote02 / COAGULATE
GRT: Floc CC
A concentrated coagulant used to bring fine suspended particles together in captured water.
Get Free Sample & Free Quote03 / SETTLE
GRT: Liquid Floc
A long-chain polymer that helps those particles settle out of suspension during water clarification.
Get Free Sample & Free Quote04 / TREAT FLOW
GRT: Floc Blocs
Solid flocculation blocks designed for locations such as drains and sediment-basin inlets.
ONE CONNECTED APPROACH
Don't just catch it.
Control where it begins.
Sediment control is more than a fence at the bottom of a slope. GRT pairs surface protection with water clarification to help manage material before and after runoff reaches a basin.
Tell us about your site and the GRT team can recommend the right combination—without asking you to describe the whole project in a form.
Get a site-specific recommendationWHERE IS THE CHALLENGE?
Two places to act.
Start with the part of your operation that needs attention. GRT can work out the treatment details with you.
ON THE GROUND
Keep soil in place.
Protect exposed slopes, batters, stockpiles and disturbed ground before wind or rain can move sediment.
IN THE WATER
Clarify what remains.
Treat suspended material in sediment basins, ponds and drainage flows as part of a site-specific water management plan.
A PRACTICAL SITE STRATEGY
From exposed soil
to managed water.
Protect the surface
Bind vulnerable soil on batters, slopes and stockpiles before weather moves it.
Capture remaining runoff
Use your site's drainage and basin controls where sediment-bearing water still collects.
Clarify & verify
Choose treatment and testing appropriate to your water and discharge requirements.
GRT PROJECT EXAMPLES
Real sites.
Visible scale.
Three published GRT examples show the range of erosion and sediment-control work. These figures describe the individual projects, not a guaranteed result for every site.
erosion-control application
Nelson bushfire recovery, NZ
GRT reports an aerial Enviro-Binder application across 95 hectares of fire-affected land.
Ask about your sitepotential basin-water treatment*
Logan Enhancement Project, QLD
GRT reports 3,750 L of Floc CC for up to 750 million litres at the stated dosage; this is a calculated capacity, not a measured discharge result.
Ask about your sitedisturbed sand treated
Sunshine Coast Airport, QLD
GRT reports supplying Soil-Loc for treatment of more than 600,000 m² of disturbed sand; Enviro-Binder was also approved for use.
Ask about your site* Logan's 750M L figure is the water volume that GRT says could be treated at the published dosage; it is not presented here as independently measured water discharged. Conditions and outcomes vary by project.
THE DETAIL IS STILL HERE
The thinking behind the treatment.
The original page covers important technical and cost considerations. They remain available here for visitors who want to explore them before making an enquiry.
Why control sediment at its source?
Fences, check dams and basins can capture material after it moves, but they also need maintenance. Treating exposed ground first helps limit the load reaching those controls. GRT describes Enviro-Binder as a polymer that penetrates and binds the upper soil layer after spray application. It can be used on flat surfaces, batters and stockpiles, subject to site assessment.
How does basin-water clarification work?
Where runoff reaches a sediment basin or pond, GRT describes a two-stage approach: Floc CC coagulates fine suspended material, then Liquid Floc helps those clusters settle. Floc Blocs can be positioned in suitable drainage flows. Dosing, monitoring and any discharge decision must follow product instructions and site-specific environmental requirements.
What about sodic soils and infrastructure?
The existing GRT page notes that sodic soils can disperse when wet and make roadworks and mining earthworks especially vulnerable to erosion. A combination of surface protection and runoff treatment can be considered for roads, cuttings, rehabilitation areas and other disturbed infrastructure.
What should we expect on cost and maintenance?
The existing GRT page positions spray application as a way to reduce installation and maintenance effort compared with some conventional controls. It also discusses potential irrigation-water savings on suitable projects. Actual product choice, application rate, durability and savings depend on the soil, climate, site design and compliance requirements.
Can this work near sensitive environments?
GRT describes its erosion-control and clarification range as non-toxic and reports use across civil works, mining, agriculture and environmentally sensitive projects. Enviro-Binder can support seed and vegetation growth. A specialist should confirm the selected product, application method, water testing and any required approvals for your specific site.
YOUR SITE. OUR NEXT CONVERSATION.
A clearer plan
starts here.
Tell us how to reach you. GRT's team can discuss your surface, runoff and water-treatment needs, then prepare a practical recommendation and quote.